Rafael
Rafael_Sanchis
Rafael Sanchis
Madrid - Spain -
Joined: Wed Mar 02 18:44:14 UTC 2022
Architect & Senior Project Control Scheduler.
Latest Posts
-
Need Help to create a History Control Table
I need a Control Table, where every time the FechaR3, FechaR4 and FechaR5 are met in the Documents Table, they are copied to the Control Table with the Document Name, the Code and all 3 Dates.…
- Answered