Design Table for WBS
Hi One consultan, I have a Database with some tables, ones of them are correspond with the structure of the project WBS Work Breakdown Structure I have four level.…
- Answered
-
Put Value Number after Formula
How can I put Value Number after these Formula The problem I have is that my field Semana change evelyn week and I need mantein the value for each week.…
-
Info delete Field
There are some way in Ninox to delete a info inside a field. I need to delete a range the info inside a field. For example I need to delete all Dates inside the Field Fechas.
- Answered
-
Re: Other formula problem
Attachment -
Other formula problem
Hi again with another problem with formula. if Actividades.Disciplinas.Discilina = "Civil" then sum('Horas Ganadas Plan') = " Civil" end Don't give me anything
- Answered
-
Formula don't work
Hi I need to take a Date from one table and insert in other field in other tablet that is posible.? I try (select FechaCorte). DataDate O try (select FechaCorte.)' DataDate) but don't work. Thanks
- Answered
-
Formula
if FechaR4 <= DataDate and FechaR4 != 0 then 'Hito 4' end I have a numeric field with that formula, that need take the info in Hito4 but don't work Some body help, aprecciate
- Answered