0
Add a base to another ?
Hi
How can I add a base to another ?
For instance I have an incomplete base 1
I would like to add to it a base 2.
Can someone tell me the way to do it ?
Thank you
3 replies
-
-
It depends the meaning of "it'. You can export data from table(s) in Base 1 and then import the data into table(s) in Base 2.
-
Thanks Dean
I found that it is possible like that :
(First, of course the base must be in csv format)
I open the base to be completed
I click on the gea icon and select > "import data"
I go to Icloud where is the csv base and import it.
In the window opened I drag and drop the fields from right to left
Content aside
- 4 yrs agoLast active
- 3Replies
- 667Views